Hi

Thanks for looking at this, i have tried to copy this code but i cant seem to get it to work.
I was hoping that the the time in k6 would continue to count down the difference from the current time to the required time, and then show a warning at 1 hour then 1/2 hour but if the compled option was selected in p6 the time shown in k 6 would freeze to highlight when the job was completed.

Peter